Prime FUJI Elevator - Prime FUJI , Prime Life
01 May
Shipping
Shipping Type and Time
1) The package will be sent from factory in 45 days after the buying order. 2) The delivery shall be by ship(Truck/Train, or Flight).Shipping Type
| Shipping Type | Condition | Price | Time | Other |
|---|---|---|---|---|
| by Ship | port near the destination | low | slow, but in 40days | preferred |
| by Truck | NO port near the destination, near China | high | quick, 15-20days | acceptted |
| by Train | NO port near the destination, train from China | high | quick, 10-15days | acceptted |
| by Flight | Extremely hurried | highest | quickest, 3-5days | NOT suggestted |
Shipping Cost
As the prices of shipment are changing frequently, the delivery price quotations will change according to the current market prices.NO surcharge.Shipping Cost
| Container | Size | Capacity | Price | Other |
|---|---|---|---|---|
| 20GP | outer 6.096 * 2.438 * 2.591minner 5.898 * 2.352 * 2.385m | 33m³(28m³)18ton | low | home elevator |
| 40GP | outer 12.192 * 2.438 * 2.591minner 12.032 * 2.352 * 2.385m | 67m³(58m³)26(22)ton | high | 2or more elevators |
| 40HQ/HC | outer 13.716 * 2.438 * 2.896minner 12.032 * 2.352 * 2.697m | 86m³(78m³)28(25)ton | higher | 2or more elevators |
Pricing method
Detail
- Item Price $
- Elevator products with Standard Configuration P1
- Non-standard customization costs (Floors, Stops, Doors, Materials, Decoration, Functions) P2
- EXW P1+P2=EXW Price
- Domestic Freight Costs P3
- FOB P1+P2+P3=FOB Price
- International Freight Costs + InsuranceP4
- CIF P1+P2+P3+P4=CIF Price
- InstallationP5
- Full Service Price P1+P2+P3+P4+P5=Full Service Price
Preferred. Transfer the first 30% as the deposit, Prime FUJI begin the production plan, transfer the left 70%, Prime FUJI will make the elevator(s) ready to delivery in 15days.
Accepted. 100% L/C at sight. Prime FUJI begin the production plan, and make the elevator(s) ready to delivery in 45days.
Accepted. Transfer the first 30% as the deposit, Prime FUJI begin the production plan, 70% L/C at sight, Prime FUJI will make the elevator(s) ready to delivery in 15days.
English
中文
Español
Русский язык